Building automation mandatory from 70 kW: EPBD and § 56 GModG
The recast EU Energy Performance of Buildings Directive (EPBD) requires non-residential buildings whose heating, air-conditioning or combined ventilation systems exceed 70 kW to have building automation and control systems and automatic lighting controls by the end of 2029. Germany has transposed this in § 56 of its Building Modernisation Act (GModG), in force since 29 July 2026. What the system must do, who is affected and what can be retrofitted wirelessly.
Who is affected
ScopeArticle 13(9) EPBD obliges all EU member states to require building automation and control systems in non-residential buildings where technically and economically feasible: by 31 December 2024 above 290 kW, by 31 December 2029 above 70 kW. The directive had to be transposed by 29 May 2026.
In Germany, § 56(1) GModG applies to non-residential buildings – offices, administration, schools, practices, retail, hotels or production with an office section – if one of the following systems has a rated output of more than 70 kilowatts, for existing and new buildings alike. The previous German rule (§ 71a GEG) applied only above 290 kW.
| System | Obligation from |
|---|---|
| Heating system | more than 70 kW rated output |
| Combined space heating and ventilation | more than 70 kW rated output |
| Air-conditioning system | more than 70 kW rated output |
| Combined air-conditioning and ventilation | more than 70 kW rated output |
What the system must be able to do
§ 56(2) GModG · Art. 13(10) EPBDThe law does not prescribe a product but capabilities. The EPBD lists them in Article 13(10); the German § 56(2) GModG spells them out in six points. The system must be able to:
| No. | Requirement | What it means in practice |
|---|---|---|
| 1 | Continuously monitor, log, analyse and adjust the consumption of all main energy carriers and all technical building systems | Record and evaluate meters for electricity, heat, gas etc. continuously – not read them once a year |
| 2 | Make the data available via a common, freely configurable interface | Evaluation independent of the manufacturer: open protocols instead of a closed island |
| 3 | Set reference values for the building’s energy efficiency | Store target and benchmark values against which operation is measured |
| 4 | Detect efficiency losses of technical building systems | Identify deviations automatically, e.g. heating with the window open |
| 5 | Inform the operator about possible improvements | Notifications and reports to those responsible |
| 6 | Monitor indoor environmental quality | New compared with the previous rule: measure CO2, temperature and humidity in the room continuously (EPBD: by 29 May 2026) |
Monitoring indoor environmental quality
§ 56(2) No. 6 GModG · Art. 13(10)(d) EPBDNeither the EPBD nor the GModG defines “indoor environmental quality” in detail. Practitioners use the indoor climate categories of EN 16798-1 and, in Germany, the technical rules for workplaces. In practice, CO2 as an indicator of ventilation, air temperature and relative humidity are measured – continuously and room by room, not as spot checks.
| Quantity | Guidance | Source |
|---|---|---|
| CO2 | below 1,000 ppm harmless; 1,000 to 2,000 ppm check and improve ventilation; above 2,000 ppm further measures | German workplace rule ASR A3.6 |
| Air temperature | should not exceed 26 °C; above that, graded duties for the employer | German workplace rule ASR A3.5 |
| Relative humidity, temperature | indoor climate categories for design | EN 16798-1 |
Wireless sensors with solar cells measure CO2, temperature and humidity without cables and without battery-change rounds. How many sensors a building needs and where they go is explained in our planning articles.
Lighting: automatic, zoned, with occupancy detection
§ 56(6) GModG · Art. 13(12) EPBDIn addition to the automation system, Article 13(12) EPBD requires automatic lighting controls in non-residential buildings – above 290 kW by 31 December 2027, above 70 kW by 31 December 2029 – suitably zoned and capable of occupancy detection. Germany’s § 56(6) GModG sets the 70 kW / 2029 requirement. In practice this means:
- Create zones by use – workstations, meeting rooms, corridors – instead of one switch for the whole floor.
- Presence detectors per zone switch or dim the lights according to occupancy; daylight can be included as well.
- In existing buildings without new cables: wireless presence detectors send to a DALI controller, which controls the luminaires via the existing DALI line.
- Data protection: presence detectors without cameras record occupancy per room, not people.
The occupancy data that controls the lighting also helps the heating: an empty room needs neither light nor comfort temperature.
Retrofitting during operation – wirelessly
Existing buildingsMost of the affected buildings already exist. Pulling cables for sensors means chasing walls, dust and downtime. With battery-free EnOcean wireless technology, the system is built in four steps:
Which requirements we cover – and which we don’t
ClassificationA compliant system usually consists of several building blocks. We supply the room level and the open data handover; the evaluation of all main energy carriers is usually done by the building management system or monitoring software to which the gateway connects.
| Requirement | Building block from DEUTA Controls | Usually comes from |
|---|---|---|
| Indoor environmental quality | Wireless CO2, temperature and humidity sensors, in-room display EnoSign® | – |
| Lighting with occupancy detection | Wireless presence detectors and DALI controllers | Luminaires and electrical installation |
| Open interface | VL-700 BASE 2: MQTT, Modbus TCP, BACnet/IP, BACnet/SC, KNX TP | – |
| Room-by-room control (§ 63 GModG) | Individual room control on the VL-700 BASE 2 with temperature sensor and window contact | – |
| Monitoring consumption | Current measurement per phase in sub-distribution boards and outgoing circuits, wireless – not calibrated | Meters under the Measuring Instruments Directive, heat and gas meters, monitoring software |
| Benchmarks, losses, notifications | Raw data from the room for evaluation | Building management system or monitoring software |
Use case: retrofitting energy monitoring →
Additionally for new buildings in Germany
§ 56(3) GModGFor a new non-residential building, § 56(3) GModG raises the bar:
- Building automation at least to automation level C of DIN/TS 18599-11:2025-10 for systems above 70 kW, level B for systems above 290 kW.
- Technical commissioning management including the balancing of the building services – for heating over at least one heating period, for cooling over at least one cooling period.
- The connected systems must communicate with each other and work with devices from different manufacturers.
Deadlines, transition and fines in Germany
§ 56(4), § 108 GModGIn Germany the deadline for existing and new buildings is the end of 31 December 2029. For systems installed in the three years before 1 January 2027 that do not meet paragraph 2, § 56(4) provides a transition rule with retrofitting after 2029 and a ten-year period – the technical literature reads the calculation of this period differently.
| Rule | Content |
|---|---|
| Deadline | by the end of 31 December 2029 (system under para. 1 and lighting under para. 6) |
| Exemption | if fitting is technically impossible or economically unreasonable |
| Transition | para. 4: systems from the three years before 1 January 2027 may be retrofitted after 2029, period of ten years |
| Fine | anyone who intentionally or recklessly fails to equip a non-residential building contrary to § 56(1), or does so incorrectly or late, commits an administrative offence – fine up to 5,000 euros (§ 108) |
Checklist for owners and planners
In seven steps- Determine the rated output of the heating, air-conditioning and ventilation systems – if one exceeds 70 kW, the obligation applies.
- Survey the building: Is there a building management system? Which meters, which interfaces, which lighting control?
- List the gaps against the required capabilities and the lighting requirement.
- Plan the indoor climate: quantities (CO2, temperature, humidity), sensors per room or area, display for occupants.
- Plan the lighting: define zones, presence detectors per zone, control via DALI.
- Define the data path: which open interface does the building management or monitoring use – MQTT, Modbus TCP, BACnet or KNX?
- Schedule and document implementation by the end of 2029; where an exemption may apply, record the reasons in writing.
Frequently asked questions
7 questionsDoes the obligation apply to existing buildings?
Yes. Both the EPBD and the German § 56 GModG cover existing and new non-residential buildings whose heating, air-conditioning or combined ventilation system exceeds 70 kW rated output. The deadline is 31 December 2029.
From what building size am I affected?
What counts is the rated output of the system, not the floor area. As a rough rule of thumb, 70 kW of heating output corresponds to about 700 to 1,400 m² of heated floor area.
Does the obligation apply to residential buildings?
No, Article 13(9) EPBD and § 56 GModG concern non-residential buildings. For new and major-renovated residential buildings the EPBD sets separate monitoring and control requirements.
What does “monitoring indoor environmental quality” mean?
The law does not define the term in detail. In practice, CO2, air temperature and humidity are measured continuously and room by room; EN 16798-1 provides guidance.
Does lighting have to be controlled by presence?
Automatic lighting controls are mandatory. The EPBD requires them to be suitably zoned and capable of occupancy detection; § 56(6) GModG says they should be. Presence detectors per zone are the usual solution.
What happens in Germany if the system is missing?
Anyone who intentionally or recklessly fails to equip a non-residential building contrary to § 56(1) GModG, or does so incorrectly or late, commits an administrative offence; the fine is up to 5,000 euros (§ 108).
Can this be retrofitted in existing buildings without new cables?
At room level, yes: wireless sensors with solar cells for indoor climate and presence, receivers powered via PoE and a gateway with open interfaces. Meters and the evaluation of all energy carriers usually come from the building management system or monitoring software.
Status: 23 November 2026. Directive (EU) 2024/1275 (EPBD), Article 13(9), (10) and (12) and Article 35. Germany: §§ 56, 63 and 108 of the Building Modernisation Act (GModG) as amended by the Act of 23 July 2026, Federal Law Gazette 2026 I No. 226, in force since 29 July 2026. Floor-area rule of thumb after M. Krödel, white paper on the GModG requirements for building automation, IGT, 08/2026. Not legal advice – the official wording is authoritative; national transposition differs between member states.
Plan the retrofit
Are you planning a non-residential building above 70 kW or retrofitting one? We put together sensors, receivers and gateway for indoor climate, presence and lighting – with an open handover to your building management system.